PS Dumps
The Dumps step contains all dumps that are listed in the Site Lists step and/or imported in the Data Sources step. Dump capacity is measured in cubic metres (m³).
Points dumps from the Site Lists are formatted with black text, and the volume can be edited.
Solid dumps from the Data Sources are formatted with bold blue text, and the volume cannot be edited.
Review dump compaction factor and volume.