PS Dump Sequences

A dump sequence is a prioritised list of dumps for the schedule to follow. Dump sequence entries can later be referenced in the Destination Rules.

Setup > Dump Sequences

To add a Dump Sequence:

  1. Press the blue Add button located in the toolbar.

  2. Rename the sequence to something meaningful.

  3. Place entry into the relevant folder (optional).

To configure the sequence:

  1. Click inside the 'Sequence' panel.

  2. Press the blue add button.

  3. Click inside the blank panel of the new entry.

  4. Select dump records.

  5. Repeat steps 2-4 to add more dumps to the sequence.

Note: Multiple dumps can be selected for each priority. Which dump is chosen will depend on which are available and then haulage distance or cycle time.